Problem solving

We were supplied with 2D drawings created by a consulting engineer for a bespoke Chimney Flue Support for a building on Cambridge Science Park.

When creating the structure on our in-house 3D CAD system prior to production, we discovered a problem with the supplied design which would have made production extremely difficult.

Using the expertise of our technical team, we quickly developed a modified solution which was accepted by the consulting engineers and site manager.

This modified design was then produced in our factory using a combination of aluminium box section and our standard Lattice Beam, before being transported to site and successfully installed.